You don't have javascript enabled. Good luck with that.
Pencarian
 Pengerukan Embung Aselih Dimulai

Aselih Embung Dredging Starts

South Jakarta Water Resources Sub-dept. began to dredge the Aselih embung (artificial lake), Jalan Aselih, Cipedak, Jagakarsa. To optimize it, the amphibious excavator will be sent to dredge it up to four meters depth.

If all goes well, it is targeted to be completed within 2-2.5 months

South Jakarta Water Resources Sub-dept. Maintenance Section Head, Firmansyah said, from total area of 8,600 square meters, only 5,000 square meters will be transformed into artificial lake.

Channel & Embung at Agrotourism Cilangkap Dredged

"Dredging will be made up to 3-4 meters. We let it natural, there will be no concrete on the left and the right side. There will be a water absorption also later," he expressed, Tuesday (5/30).  

According to him, the rest land will be greened around the artificial lake. Additionally, its location is also connected with water channel in the surrounding areas, including Krukut River.

"If all goes well, it is targeted to be completed within 2-2.5 months," he closed.

Linked News
Popular News indeks
  1. Pramono Inaugurates GMAHK Taman Harapan Jakarta

    access_time25-10-2026 remove_red_eye515 personDessy Suciati
  2. JRF, Ye Concert Inject Rp 625 Billion into Jakarta's Economy

    access_time26-10-2026 remove_red_eye474 personDessy Suciati
  3. Transjakarta Adjusts Routes Amid Demonstrations

    access_time28-10-2026 remove_red_eye445 personAldi Geri Lumban Tobing
  4. Participating in a 10K Run, Pramono Calls JRF a Role Model for Running Events in Indonesia

    access_time25-10-2026 remove_red_eye387 personAldi Geri Lumban Tobing
  5. Pramono Leads Youth Pledge Day Ceremony at City Hall

    access_time28-10-2026 remove_red_eye353 personFakhrizal Fakhri