You don't have javascript enabled. Good luck with that.
Pencarian
 Pengerukan Embung Aselih Dimulai

Aselih Embung Dredging Starts

South Jakarta Water Resources Sub-dept. began to dredge the Aselih embung (artificial lake), Jalan Aselih, Cipedak, Jagakarsa. To optimize it, the amphibious excavator will be sent to dredge it up to four meters depth.

If all goes well, it is targeted to be completed within 2-2.5 months

South Jakarta Water Resources Sub-dept. Maintenance Section Head, Firmansyah said, from total area of 8,600 square meters, only 5,000 square meters will be transformed into artificial lake.

Channel & Embung at Agrotourism Cilangkap Dredged

"Dredging will be made up to 3-4 meters. We let it natural, there will be no concrete on the left and the right side. There will be a water absorption also later," he expressed, Tuesday (5/30).  

According to him, the rest land will be greened around the artificial lake. Additionally, its location is also connected with water channel in the surrounding areas, including Krukut River.

"If all goes well, it is targeted to be completed within 2-2.5 months," he closed.

Linked News
Popular News indeks
  1. Jakarta Council Begins Deliberations on New Population and Housing Bylaws

    access_time21-08-2026 remove_red_eye1808 personFakhrizal Fakhri
  2. Jakarta Assesses Needs and Coordinates Aid for NTT Earthquake Victims

    access_time16-08-2026 remove_red_eye734 personAldi Geri Lumban Tobing
  3. Jakarta Prepares Aid for NTT Earthquake Victims

    access_time16-08-2026 remove_red_eye688 personDessy Suciati
  4. Pramono: Independence must Be Manifested Through Concrete Action

    access_time17-08-2026 remove_red_eye685 personDessy Suciati
  5. Pramono Commends Madurese Community for Their Vital Role in Building Jakarta

    access_time19-08-2026 remove_red_eye658 personDessy Suciati